COMPANY PROFILE |
TABLE OF CONTENTST |
1. VISION .............................................................................................................................................................................................................. |
3. |
|
2. MISSION .......................................................................................................................................................................................................... |
4. |
|
3. PROVIDER HISTORY ................................................................................................................................................................................... |
4. |
|
4. CUSTOMER TARGET GROUP ................................................................................................................................................................... |
5. |
|
5. CONTRACTUAL COMMITMENTS .......................................................................................................................................................... |
6. |
|
5.1 5.2 5.3 |
LEARNERSHIPS ............................................................................................................................................................................. INDIVIDUAL COURSES .............................................................................................................................................................. COMPUTER TRAINING .............................................................................................................................................................. |
6. 7. 8. |
|
6. TRAINING MATERIAL ............................................................................................................................................................................... |
9. |
|
6.1 6.2 6.3 |
DEVELOPMENT ............................................................................................................................................................................ IMPLEMENTATION ..................................................................................................................................................................... ASSESSMENT INSTRUMENTS ................................................................................................................................................. |
9. 9. 9. |
|
7. COMMITMENT TO EXCELLENCE ........................................................................................................................................................... |
10. |
|
8. EWSETA ACCREDITATION STATUS. |
|
|

|
|
|
1. VISION.
It is the vision of Learning Solutions to be the largest provider in learning for Power Plants in the Power Generation, Transmission and Distribution Sectors offering a variety of learning units spread across all Power utilities in South Africa, excellence in innovation towards learning design and delivery opportunities for learners to progress within set outcomes criteria as defined by relevant au.thorities, and assure quality in Education and training by maintaining accreditation standards with the rel.evant Sector for Education and Training Authority.
|
2. MISSION.
To provide results driven training to all learners within the Power fraternity and ensure that each learner gains relevant skills and knowledge through learning which can be used to their advantage while following their chosen career path. Ensuring skills development in accordance with, The Energy Sector Education and Training Authority (ESETA) and The South African Qualifications Authority (SAQA).
In its mission Learning Solutions commits itself to the following:
Quality Education and Training Leading, challenging, creating and exploring knowledge Contractual partnerships with Employers and learners in registered learnerships Positively contributing to national objectives regarding skills development and economic growth.
|
3. PROVIDER HISTORY.
Learning Solutions specializes in the design, development and implementation of all skill development required for Power Generation, Transmission and Distribution South Africa, addressing skill development needs for Hydro, Nuclear and Fossil Power Plants as well as the control of Electrical Networks.
Learning Solutions was established in 2001 under the Executive Directorship of Mr Kobus Brits, Kobus was employed by Eskom for 24 years in the discipline of leading the Operating Training group for Power Plant Operation. He has been the Chairperson for Power Plant Operations Standards Generating Body (SGB) since 2003 and serves the industry by setting National Standards for competence of Operating outcomes in all functional roles.
Learning Solutions is an accredited learning provider adhering to the criteria as set out by the Energy Sector Education and Training Authority (Eseta), to provide training on a National Level within quality standards as set out by the Energy Sector Education and Training Authority (Eseta).
The company has grown to permanently employ 24 full time training facilitators, 6 learner ship administrators, 1 business manager and 1 business administrator. Training facilitators and 6 learner ship administrators are based on various sites, the business manager and business administrator are based at Head Office in eMalahleni.
|
4. CUSTOMER TARGET GROUP
All training is aimed at Power Production, Distribution and Transmission in an around South Africa. Learning Solutions client base consists of the following: Electricity Supply Commission (Eskom) – Various Power Stations, Local Government -Pretoria West Power Station, Rooiwal Power Station, Sappi Saiccor,Sappi fine papers, Rotek Engineering, Eskom Uganda ,National Energy Regulator of South Africa (NERSA) Training is provided within the following divisions:
|
4.1 4.2 4.3 4.4 |
Learner ships – Power Generation, Distribution and Generation Individual Training Courses Non Accredited training interventions Learning Programmes on Boiler design and Operation |
|
|
5. CONTRACTUAL COMMITMENTS
|
5.1 |
LEARNERSHIPS
Being an accredited provider Learner Solutions has been awarded contracts with various power producers around the country. The entire Power Plant Operations learning systems of the following power producers have been outsourced to Learning Solutions:
Camden Power Station
Komati Power Station
Rotek Engineering
The learning systems of our clients, includes but is not limited to the following:
Entire administration function – on site
Providing Power Generation, Distribution and Transmission Facilitators and or assessors – on site
Development of Learning Material
Assessment Tools
Being an accredited training provider all training is provided in accordance with the registered Learnerships and in conjunction with criteria as set out by the Energy Sector Education and Training Authority (ESeta).
The following Learnerships/Learning Programmes are presented:
|
| |
61549 National Certificate: Power Plant Auxiliary Systems Operations NQF 3 61569 Further Education and Training Certificate: Power Plant Operations NQF 4 23733 National Certificate: Nuclear Power Plant Operation NQF 4 23678 National Certificate: Fossil Power Plant Operation NQF 4 61570 National Diploma: Power Plant Process Control Operations NQF 5 48978 Further Education and Training Certificate: Electrical Network control NQF 4 63209 National Certificate: Energy Regulation LP Boiler Assistant (Industrial hospital Boilers) LP Boiler Operator (Industrial hospital Boilers) |
5.2
|
INDIVIDUAL COURSES
A need was also identified by our client Eskom Generation – Witbank, to present individual courses for GSDP learners. Learning Solutions presents but is not limited to the presentation of the following individual courses:
Safety Regulations
ORHVS
Turbine Plant
Boiler Plant
Auxiliary Plant
Electrical Reticulation
Practical Simulations
Occupational health and safety
Leadership Development
ETDP development (Assessment,Mentoring,Coaching,Learning Facilitation, Unit standard development)
The above courses are presented theoretically and practically.
|
5.3 |
COMPUTER TRAINING
All Qualifications registered by South African Qualifications Authority include Unit Standard Based computer training. Learning Solutions also provides the following unit standards based computer training:
MS Word
MS Excel
MS Access
MS Outlook
The above courses can be presented from Basic – Advanced. Learning Solutions is an accredited training provider for computer training.
|
|
|
5.4 |
NON ACCREDITED TRAINING
Learning Solutions presents non accredited training to various clients in the power plant Industry in South Africa. These interventions will be custom-made for the various client needs to Improve there bottom line results and to better there core business processes. During this customization Learning Solutions will use existing training material combined with what the clients needs to then present the training interventions.
Examples:
Rotek engineering basic business understanding.
Leadership profile with learning gap closing.
Transformational leadership.
Transactional leadership.
|
|
|
6. TRAINING MATERIAL
|
|
|
6.1 |
DEVELOPMENT
Outcomes based education and training requires a relevant new approach to training material. Learning Solutions is in a position with competent training material developers to develop site specific material in the discipline of Power Generation, Transmission and Distribution, but is not limited to such disciplines. Learning material is developed to meet the needs of Unit Standards criteria as required by South African Qualifications Authority (SAQA). Adjustment to learning material format as required by the Energy Sector for Education and Training is currently underway with all Learning Material in use.
|
6.2 |
IMPLEMENTATION
Learning Solutions employs accredited, registered and experienced Facilitators and Assessors to implement and ensure that all training material developed and or current material is presented within the criteria as set out by the Energy and Water Sector for Education and Training Authority (EWSETA). These facilitators are committed to a code of conduct and will at all times strive to provide all clients and learners with fair training and feedback to ensure that the desired outcomes, for both client and learner is achieved.
|
6.3 |
ASSESSMENT INSTRUMENTS
Competence Based Assessment Instruments are required by National Standards to provide a fair approach to the assessment of each learner. These assessment instruments can be developed by Learning Solutions in conjunction with learning material.
|
7. COMMITMENT TO EXCELLENCE |
|
|
| |
Learning Solutions is committed to excellence and boasts with and integrated quality management system to ensure that all policies and procedures are implemented and maintained to strive for excellent service to our clients. |
8. EWSETA ACCREDITATION STATUS. |
| |
Learning Solutions - Pretoria Notification of accreditation with the EWSeta Enclosed herewith please find your company’s status with the EWSeta For attention: |
A. |
Your company’s unique identifier with the EWSeta 47 |
B. |
Your ETQA ID with the EWSeta 583 |
C. |
EWSeta ETQA decision number 0049 |
D. |
Accreditation period from 26-Jul-07 To 25-Mar-14 |
E. |
Your record was last updated on 23-Mar-11 |
| |
The accreditation status with the EWSeta include:
Please feel free to raise any queries to the ETQA office. Yours truly Joanna Seabi ETQA Officer |
| |
Your organization’s accreditation status are specifically associated with the following: Registered assessor/s linked to your organisation Registration Identifier Surname Name From To |
| |
|
| |
|
| |
1 1720 Booysen Emmarentia 2012/07/24 2015/07/24
2 583ETQA03A152 Brits Abraham 2011/05/10 2014/05/09
3 583ETQA06A280 Haasbroek Leonard 2011/03/14 2014/03/13
4 583ETQA08A345 Jordaan Dawid 2011/05/10 2014/05/09
5 ENER-A0903-064 Kotze Louis 2012/04/10 2015/04/10
6 ENER-A0903-185 Van Vollenstee Johannes 2012/06/15 2015/06/15
7 ENER-A0903-880 Kruger Pieter 2012/06/13 2015/06/13
8 ENER-A1103-204 Heydenrych Belinda-Lee 2011/03/14 2014/03/13
9 ENER-A1110-220 Molefe Elizabeth 2011/10/17 2014/10/16
Registered moderator/s linked to your organisation
Registration Identifier Last Name Name From To
1 Mod583GRo1010 Roos Gerhardus 2010/10/16 2013/10/15
2 Mod583LCr0612 Cremer Leon 2012/06/04 2015/06/04
Qualification/s linked to your organisation Provision date Qualification ID Title From To
1 23677 National Certificate: Power Plant Auxiliary Systems 2009/04/01 11: 2014/02/26 06: Operation Qualification linked status Fully accredited training provider ETQA approval number: 0049
2 23679 National Diploma: Fossil Power Plant Process Control 2009/04/01 11: 2014/02/26 06: Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-090403
3 23733 National Certificate: Nuclear Power Plant Operation 2009/04/01 2014/02/26 Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-090818
|
| |
4 23734 National Diploma: Nuclear Power Plant Process Control 2009/04/01 2014/02/26 Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-090818
5 48978 Further Education and Training Certificate: Electrical 2009/04/01 2014/02/26 Network Control Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-090818
6 23678 National Certificate: Fossil Power Plant Operation 2007/08/01 2014/02/28 Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-100526
7 61569 Further Education and Training Certificate: Power Plant 2010/08/01 2014/02/28 Operations Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-110224
8 66514 National Certificate: Energy Regulation: Electrical 2012/07/01 2014/03/25 Qualification linked status Fully accredited training provider ETQA approval number: ENER-01-47-120807
Unit Standard/s linked to your organisation Provision date Unit Standard IDTitle From To
1 114470 Demonstrate knowledge and understanding of thermal 2006/11/29 2009/11/27 efficiency in a power plant ETQA approval number: ENER-01-47-090403
2 15226 Implement systems to meet the flow of information in a 2006/11/29 2009/11/27 team, department or division ETQA approval number: ENER-01-47-090403
3 14062 Demonstrate Knowledge of Safe Entry into Prohibited and/ 2006/11/29 2009/11/27 or Restricted Areas ETQA approval number: ENER-01-47-090403
4 14056 Demonstrate knowledge and understanding of earthing 2006/11/29 2009/11/27 practices on alternating current power systems ETQA approval number: ENER-01-47-090403
5 14055 Understand water chemistry in a power plant environment 2006/11/29 2009/11/27 ETQA approval number: ENER-01-47-090403
6 14049 Understands, Applies and Displays Constructive Thinking 2006/11/29 2009/11/27 ETQA approval number: ENER-01-47-090403
7 14048 Apply Self Management Concepts 2006/11/29 2009/11/27 ETQA approval number: ENER-01-47-090403
|
| |
8 14047 Apply Sound Management Practices in Order to Achieve 2006/11/29 2009/11/27 Short to Mid Term Objectives ETQA approval number: ENER-01-47-090403
9 14046 Lead subordinates to support the strategy of the organisation 2006/11/29 2009/11/27 ETQA approval number: ENER-01-47-090403
10 14045 Apply Transformational Leadership by Interacting with Key 2006/11/29 2009/11/27 Stakeholders ETQA approval number: ENER-01-47-090403
11 14041 Demonstrate Knowledge and Understanding of the Electrical 2006/11/29 2009/11/27 Technology Associated with the Control of Electrical Energy on a Power Generating Unit in the Power Plant ETQA approval number: ENER-01-47-090403
12 13803 Phasing and or synchronising on high voltage intergrated 2006/11/29 2009/11/27 systems ETQA approval number: ENER-01-47-090403
13 13602 Preserve Plant and or Equipment on a Steam Driven Turbo- 2006/11/29 2009/11/27 Generator Plant ETQA approval number: ENER-01-47-090403
14 13601 Preserve Plant and or Equipment on a Fossil Fired Steam 2006/11/29 2009/11/27 Generator from a Control Room ETQA approval number: ENER-01-47-090403
15 13600 Demonstrate knowledge of regulatory requirements for 2006/11/29 2009/11/27 permit to work systems ETQA approval number: ENER-01-47-090403
16 13599 Stabilise Out of Normal Emergency Conditions on a Fossil 2006/11/29 2009/11/27 Fired Power Generating Unit from a Control Room ETQA approval number: ENER-01-47-090403
17 13597 Shutdown a fossil fired power generating unit from a control 2006/11/29 2009/11/27 room ETQA approval number: ENER-01-47-090403
18 13596 Control load variations on a fossil fired power generation unit 2006/11/29 2009/11/27 from a control room ETQA approval number: ENER-01-47-090403
19 13575 Stabilise Out of Normal Emergency Conditions on a Steam 2006/11/29 2009/11/27 Driven Turbo-Generator System from a Control Room ETQA approval number: ENER-01-47-090403
20 13573 Stabilise Out of Normal Emergency Conditions on a Fossil 2006/11/29 2009/11/27 Fired Steam Generator from a Control Room ETQA approval number: ENER-01-47-090403
21 13572 Monitor and Sustain Plant Operability of a Steam Driven 2006/11/29 2009/11/27 Turbo-Generator System from a Control Room ETQA approval number: ENER-01-47-090403
22 13571 Monitor and Sustain Plant Operability on a Fossil Fired 2006/11/29 2009/11/27 Steam Generator from a Control Room ETQA approval number: ENER-01-47-090403
|
| |
23 13568 Shutdown a steam driven turbo-generator system from a 2006/11/29 2009/11/27 control room ETQA approval number: ENER-01-47-090403
24 13566 Shut down a fossil fired steam generator from a control room 2006/11/29 2009/11/27 ETQA approval number: ENER-01-47-090403
25 13564 Control load variations on a steam driven turbo-generator 2006/11/29 2009/11/27 from a control room ETQA approval number: ENER-01-47-090403
26 13562 Control load variation on a fossil fired steam generator from 2006/11/29 2009/11/27 a control room ETQA approval number: ENER-01-47-090403
27 13561 Startup a Steam Driven Turbo-Generator from a Control 2006/11/29 2009/11/27 Room. ETQA approval number: ENER-01-47-090403
28 13558 Startup a fossil fired steam generator from a control room 2006/11/29 2009/11/27 ETQA approval number: ENER-01-47-090403
29 12998 Produce spreadsheets using accounting related information 2006/11/29 2009/11/27 technology ETQA approval number: ENER-01-47-090403
30 10933 Understand the principles of alternating current (AC) motor 2006/11/29 2009/11/27 operation and application in a process plant ETQA approval number: ENER-01-47-090403
31 10897 Explain transformer characteristics applied on power 2006/11/29 2009/11/27 systems ETQA approval number: ENER-01-47-090403
32 10893 Demonstrate knowledge and understanding of electrical 2006/11/29 2009/11/27 power generation ETQA approval number: ENER-01-47-090403
33 10689 Understand electrical protection systems associated with 2006/11/29 2009/11/27 power generating processes ETQA approval number: ENER-01-47-090403
34 10144 Identify, suggest and implement corrective actions to 2006/11/29 2009/11/27 improve quality ETQA approval number: ENER-01-47-090403
35 14881 Operate Steam Turbine Steam Systems 2009/04/01 2014/02/26 ETQA approval number:
36 14880 Operate Steam Turbine Feedwater Storage, Heating and 2009/04/01 2014/02/26 Pumping Systems ETQA approval number:
37 14217 Operate Bulk Lubrication Oil Systems 2009/04/01 2014/02/26 ETQA approval number:
38 14126 Demonstrate knowledge of steam turbines design and 2009/04/01 2014/02/26 application ETQA approval number:
|
| |
39 14119 Operate nuclear auxiliary cooling systems 2009/04/01 2014/02/26 ETQA approval number:
40 14116 Operate nuclear reactor safeguard systems 2009/04/01 2014/02/26 ETQA approval number:
41 14115 Operate nuclear reactor coolant and support systems 2009/04/01 2014/02/26 ETQA approval number:
42 14113 Operate support plant fire extinguishing systems 2009/04/01 2014/02/26 ETQA approval number:
43 14107 Operate Support Plant Diesel Systems 2009/04/01 2014/02/26 ETQA approval number:
44 14102 Apply Radiation Requirements for Activities in Radiologically 2009/04/01 2014/02/26 Controlled Zones at a Nuclear Power Plant ETQA approval number:
45 14064 Understand Constructive Thinking 2009/04/01 2014/02/26 ETQA approval number:
46 14063 Apply Self Management through the Concepts of Positive 2009/04/01 2014/02/26 Self-esteem and Resiliency ETQA approval number:
47 14061 Understand Management Practices 2009/04/01 2014/02/26 ETQA approval number:
48 14060 Understand transformational leadership 2009/04/01 2014/02/26 ETQA approval number:
49 14059 Operate Steam Turbine Condenser Air Evacuation Systems 2009/04/01 2014/02/26 ETQA approval number:
50 13801 Operate radioactive gaseous waste handling systems 2009/04/01 2014/02/26 ETQA approval number:
51 13798 Operate nuclear reactor fire extinguishing systems 2009/04/01 2014/02/26 ETQA approval number:
52 13794 Operate nuclear reactor vent and drain systems 2009/04/01 2014/02/26 ETQA approval number:
53 13728 Operate nuclear reactor refueling water systems 2009/04/01 2014/02/26 ETQA approval number:
54 13727 Operate radioactive liquid waste treatment and handling 2009/04/01 2014/02/26 systems ETQA approval number:
55 13726 Operate support plant compressed air systems 2009/04/01 2014/02/26 ETQA approval number:
56 13725 Operate Support Plant Electrical Systems 2009/04/01 2014/02/26 ETQA approval number:
|
| |
57 13724 Operate Turbo-Generator Auxiliary Systems 2009/04/01 2014/02/26 ETQA approval number:
58 13723 Operate turbo-generator fire extinguishing system on a 2009/04/01 2014/02/26 nuclear power plant ETQA approval number:
59 13721 Operate Turbo-Generator Cooling Systems 2009/04/01 2014/02/26 ETQA approval number:
60 13720 Operate Turbo-Generator Oil Systems 2009/04/01 2014/02/26 ETQA approval number:
61 13710 Explain thermodynamic principles and concepts as applied 2009/04/01 2014/02/26 in nuclear power generating plant ETQA approval number:
62 13709 Apply fundamental reactor engineering principles and 2009/04/01 2014/02/26 theories related to nuclear power generating plant ETQA approval number:
63 13707 Describe the operation and application of electrical 2009/04/01 2014/02/26 equipment as required for nuclear power plant ETQA approval number:
64 13706 Describe fundamental material science related to brittle 2009/04/01 2014/02/26 fracture and vessel thermal stress in nuclear power plants ETQA approval number:
65 13705 Describe fundamental instrumentation and measurement 2009/04/01 2014/02/26 equipment associated with nuclear power plant ETQA approval number:
66 11944 Operate Steam Turbine Condensate System 2009/04/01 2014/02/26 ETQA approval number:
67 8979 Use language and communication in occupational learning 2009/04/01 2014/02/26 programmes ETQA approval number:
68 8976 Write for a wide range of contexts 2009/04/01 2014/02/26 ETQA approval number:
69 8974 Engage in sustained oral communication and evaluate 2009/04/01 2014/02/26 spoken texts ETQA approval number:
70 8970 Write texts for a range of communicative contexts 2009/04/01 2014/02/26 ETQA approval number:
71 8968 Accommodate audience and context needs in oral 2009/04/01 2014/02/26 communication ETQA approval number:
72 7572 Demonstrate knowledge of and produce computer 2009/04/01 2014/02/26 spreadsheets using basic functions ETQA approval number:
|
| |
73 7547 Operate a personal computer system 2009/04/01 2014/02/26 ETQA approval number:
74 7484 Describe, represent, analyse and explain changes in shape 2009/04/01 2014/02/26 and motion in 2- and 3-dimensional space with justification ETQA approval number:
75 7470 Work with a wide range of patterns and inverses of functions 2009/04/01 2014/02/26 and solve related problems ETQA approval number:
76 7466 Represent and operate on complex numbers in non-trivial 2009/04/01 2014/02/26 situations ETQA approval number:
77 7465 Collect and use data to establish complex statistical and 2009/04/01 2014/02/26 probability models and solve related problems ETQA approval number:
78 14907 Describe the Regulatory Nuclear Safety requirements as 2009/04/01 2014/02/26 applied in nuclear power generating plant ETQA approval number: ENER-01-47-090818
79 14233 Preserve Steam Driven Turbo-Generator Plant 2009/04/01 2014/02/26 ETQA approval number: ENER-01-47-090818
80 14232 Preserve Nuclear Steam Supply Plant 2009/04/01 2014/02/26 ETQA approval number: ENER-01-47-090818
81 14231 Stabilise Out of Normal and or Emergency Conditions on 2009/04/01 2014/02/26 Nuclear Power Plant Turbo Generating Unit ETQA approval number: ENER-01-47-090818
82 14230 Stabilise Out of Normal and or Emergency Condition on a 2009/04/01 2014/02/26 Nuclear Steam Supply Plant from a Control Room ETQA approval number: ENER-01-47-090818
83 14227 Monitor and Sustain Nuclear Steam Supply Plant from a 2009/04/01 2014/02/26 Control Room ETQA approval number: ENER-01-47-090818
84 13819 Shutdown a Nuclear Steam Supply Plant from a Control 2009/04/01 2014/02/26 Room ETQA approval number: ENER-01-47-090818
85 13817 Control Load Variations on a Turbo-Generator Plant from a 2009/04/01 2014/02/26 Control Room ETQA approval number: ENER-01-47-090818
86 13816 Control Load Variations on a Nuclear Steam Supply Plant 2009/04/01 2014/02/26 from a Control Room ETQA approval number: ENER-01-47-090818
87 13811 Start up Turbo-Generator Plant from a Control Room 2009/04/01 2014/02/26 ETQA approval number: ENER-01-47-090818
88 13804 Start up Nuclear Steam Supply Plant from a Control Room 2009/04/01 2014/02/26 ETQA approval number: ENER-01-47-090818 |
| |
89 7570 Produce word processing documents for business 2009/04/01 2014/02/26 ETQA approval number: ENER-01-47-090818
90 7568 Demonstrate knowledge of and produce word processing 2009/04/01 2014/02/26 documents using basic functions ETQA approval number: ENER-01-47-090818
91 7567 Produce and use spreadsheets for business 2009/04/01 2014/02/26 ETQA approval number: ENER-01-47-090818
92 116462 Sustain plant operability of a gas turbine power generating 2009/04/01 2014/02/26 unit ETQA approval number:
93 116459 Start up a gas turbine power generator system from a 2009/04/01 2014/02/26 control room ETQA approval number:
94 116457 Stabilise transient conditions on a gas power generating 2009/04/01 2014/02/26 system from a control room ETQA approval number:
95 116454 Shutdown a gas turbine power generator unit from a control 2009/04/01 2014/02/26 room for maintenance outage ETQA approval number:
96 116453 Perform operations on high voltage integrated systems 2009/04/01 2014/02/26 ETQA approval number:
97 116451 Operate on transformers within electrical networks 2009/04/01 2014/02/26 ETQA approval number:
98 116440 Operate high voltage breakers on radial feeders 2009/04/01 2014/02/26 ETQA approval number:
99 116439 Operate electrical converters on electrical networks 2009/04/01 2014/02/26 ETQA approval number:
100 116436 Operate breakers on radial and integrated networks 2009/04/01 2014/02/26 ETQA approval number:
101 116434 Control electrical networks from a control centre 2009/04/01 2014/02/26 ETQA approval number:
102 116416 Control load variations on a gas turbine power generating 2009/04/01 2014/02/26 system from a control room ETQA approval number:
103 116407 Control frequency and voltages in an Islanding condition on 2009/04/01 2014/02/26 electrical networks ETQA approval number:
104 14065 Demonstrate knowledge of steam turbines design and 2009/04/01 2014/02/26 application ETQA approval number:
105 8975 Read analyse and respond to a variety of texts 2009/04/01 2014/02/26 ETQA approval number:
|
| |
106 8969 Interpret and use information from texts 2009/04/01 2014/02/26 ETQA approval number:
107 7786 Operate a Computer 2009/04/01 2014/02/26 ETQA approval number:
108 13962 Demonstrate Knowledge and Understanding of The 2009/11/23 2013/12/22 Organisation ETQA approval number: ENER-US-47-091123
109 13963 Demonstrate Knowledge and Understanding Towards 2009/11/23 2013/12/22 Occupational health and safety Regulatory Requirements ETQA approval number: ENER-US-47-091123
110 10195 Apply Engineering Principles and concepts in a Power 2009/11/23 2013/12/22 Generation Process Plant ETQA approval number: ENER-US-47-091123
111 10585 Describe bearing types, designs and application theories 2009/11/23 2013/12/22 associated with process plants ETQA approval number:
112 10582 Describe lubrication methods and applications associated 2009/11/23 2013/12/22 with process plants ETQA approval number: ENER-US-47-091123
113 14036 Describe plant instrumentation and process measurement 2009/11/23 2013/12/22 used on Power Generation plant ETQA approval number: ENER-US-47-091123
114 10613 Describe power transmission designs and application 2009/11/23 2013/12/22 theories associated with process plants ETQA approval number: ENER-US-47-091123
115 10587 Describe the working principle of compressed air systems 2009/11/23 2013/12/22 associated with process plant ETQA approval number: ENER-US-47-091123
116 10598 Differentiate between valve designs and application theories 2009/11/23 2013/12/22 associated with process plants ETQA approval number: ENER-US-47-091123
117 10488 Interpret liquid transfer theories in a process plant 2009/11/23 2013/12/22 ETQA approval number: ENER-US-47-091123
118 14038 Interpret the operation of internal combustion engines used 2009/11/23 2013/12/22 in power plants ETQA approval number: ENER-US-47-091123
119 114463 Operate Cooling Water Systems 2009/11/23 2013/12/22 ETQA approval number: ENER-US-47-091123
120 255974 Operate fire water systems on fossil power plants 2009/11/23 2013/12/22 ETQA approval number: ENER-US-47-091123
121 13703 Perform operational communicational activities ETQA approval number:
|
| |
122 14905 Operate Fossil Fired Steam Generator Auxiliary Systems 2007/08/01 2014/02/28 ETQA approval number:
123 14903 Operate Fossil Fired Steam Generator Spray Water System 2007/08/01 2014/02/28 ETQA approval number:
124 14901 Operate Fossil Fired Steam Generator for Fuel Firing System 2007/08/01 2014/02/28 ETQA approval number:
125 14898 Operate Fossil Fired Steam Generator and Combustion Air 2007/08/01 2014/02/28 and Flue Gas Systems ETQA approval number:
126 14896 Operate Fossil Fired Steam Generator Water and Steam 2007/08/01 2014/02/28 System ETQA approval number:
127 14037 Demonstrate knowledge and understanding of heat 2007/08/01 2014/02/28 exchange equipment used in a process plant ETQA approval number:
128 10574 Demonstrate knowledge of Steam Generator design and 2007/08/01 2014/02/28 application ETQA approval number:
129 8972 Interpret a variety of literary texts 2007/08/01 2014/02/28 ETQA approval number:
130 255896 Operate fossil fired steam generator for fuel firing system 2010/08/01 2014/02/28 ETQA approval number:
131 242755 Demonstrate knowledge and understanding of power plant 2010/08/01 2014/02/28 auxilliary systems ETQA approval number:
132 119472 Accommodate audience and context needs in oral/signed 2010/08/01 2014/02/28 communication ETQA approval number:
133 119471 Use language and communication in occupational learning 2010/08/01 2014/02/28 programmes ETQA approval number:
134 119469 Read/view, analyse and respond to a variety of texts 2010/08/01 2014/02/28 ETQA approval number:
135 119466 Interpret a variety of literary texts 2010/08/01 2014/02/28 ETQA approval number:
136 119462 Engage in sustained oral/signed communication and 2010/08/01 2014/02/28 evaluate spoken/signed texts ETQA approval number:
137 119459 Write/present/sign for a wide range of contexts 2010/08/01 2014/02/28 ETQA approval number:
138 119458 Analyse and respond to a variety of literary texts 2010/08/01 2014/02/28 ETQA approval number:
|
| |
139 119457 Interpret and use information from texts 2010/08/01 2014/02/28 ETQA approval number:
140 14216 Operate Hydro Generator Plant Bearing Systems 2010/08/01 2014/02/28 ETQA approval number:
141 14215 Operate Hydro Power Generator Starting and Braking 2010/08/01 2014/02/28 Devices ETQA approval number:
142 14213 Operate hydro power generator mechanical brake and 2010/08/01 2014/02/28 jacking system ETQA approval number:
143 14212 Operate hydro generator cooling system 2010/08/01 2014/02/28 ETQA approval number:
144 14211 Operate hydro power generation transformer auxiliary 2010/08/01 2014/02/28 systems ETQA approval number:
145 13673 Operate hydro power generation turbine plant main pump 2010/08/01 2014/02/28 and/or turbine system ETQA approval number:
146 13666 Operate hydro turbine plant blow down air system 2010/08/01 2014/02/28 ETQA approval number:
147 13665 Operate hydro turbine plant shaft sealing system 2010/08/01 2014/02/28 ETQA approval number:
148 13664 Operate hydro turbine plant governing systems 2010/08/01 2014/02/28 ETQA approval number:
149 13658 Operate hydro turbine plant main inlet valve system 2010/08/01 2014/02/28 ETQA approval number:
150 13652 Operate hydro turbine plant bearing systems 2010/08/01 2014/02/28 ETQA approval number:
151 13645 Operate hydro turbine plant cooling water system 2010/08/01 2014/02/28 ETQA approval number:
152 13638 Operate hydro power generation station plants - Emergency 2010/08/01 2014/02/28 standby electrical systems ETQA approval number:
153 13633 Operate hydro power generation drainage and dewatering 2010/08/01 2014/02/28 systems ETQA approval number:
154 10900 Operate hydro power generation common cooling water 2010/08/01 2014/02/28 ETQA approval number:
155 9016 Represent analyse and calculate shape and motion in 2-and 2010/08/01 2014/02/28 3-dimensional space in different contexts ETQA approval number:
|
| |
156 9015 Apply knowledge of statistics and probability to critically 2010/08/01 2014/02/28 interrogate and effectively communicate findings on life related problems ETQA approval number:
157 7468 Use mathematics to investigate and monitor the financial 2010/08/01 2014/02/28 aspects of personal, business, national and international issues ETQA approval number:
158 365259 Describe and use techniques for safe handling and usage of 2012/10/18 2014/03/24 chlorine ETQA approval number: ENER-US-47-121019
159 229998 Explain and perform fall arrest techniques when working at 2012/10/18 2014/03/24 height ETQA approval number: ENER-US-47-121019 |
| |
|
| |
|